Onicon F-2600 Uživatelský manuál Strana 3

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 131
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 2
11451 Belcher Road South, Largo, FL 33773 • USA • Tel +1 (727) 447-6140 • Fax (727) 442-5699 • [email protected]
F-2600 & F-2700 Vortex Flow Meter Manual 02/15 - 0808-7 / 19204 Page 3
WARNINGS AND CAUTIONS
WARNING
Consulttheowmeternameplateforspecicowmeterapprovalsbeforeanyhazardous
location installation.
Hot tapping must be performed by a trained professional. U.S. regulations often require
a hot tap permit. The manufacturer of the hot tap equipment and/or the contractor
performing the hot tap is responsible for providing proof of such a permit.
Allowmeterconnections,isolationvalvesandttingsforcold/hottappingmusthave
the same or higher pressure rating as the main pipeline.
ForF-2700seriesinsertionowmeterinstallations,aninsertiontoolmustbeusedforany
installationwhereaowmeterisinsertedunderpressuregreaterthan50psig.
Toavoidseriousinjury,DONOTloosenacompressionttingunderpressure.
To avoid potential electric shock, follow National Electric Code or your local code when
wiring this unit to a power source. Failure to do so could result in injury or death. All
AC power connections must be in accordance with published CE directives. All wiring
procedures must be performed with the power Off.
Beforeattemptinganyowmeterrepair,verifythatthelineisnotpressurized.Always
removemainpowerbeforedisassemblinganypartofthemassowmeter.
CAUTION
Calibrationmustbeperformedbyqualiedpersonnel.ONICON,Incorporated,strongly
recommendsthatyoureturnyourowmetertothefactoryforcalibration.
Inordertoachieveaccurateandrepeatableperformance,theowmetermustbeinstalled
withthespeciedminimumlengthofstraightpipeupstreamanddownstreamoftheow
meters sensor head.
When using toxic or corrosive gases, purge the line with inert gas for a minimum of four
hoursatfullgasowbeforeinstallingtheowmeter.
ForF-2700seriesinsertionowmeterinstallations,thesensoralignmentpointermust
pointdownstreaminthedirectionofow.
TheACwireinsulationtemperatureratingmustmeetorexceed85°C(185°F)
!
!
Zobrazit stránku 2
1 2 3 4 5 6 7 8 ... 130 131

Komentáře k této Příručce

Žádné komentáře